Demolition Utility Disconnect Verification
A safety talk about confirming electric, gas, water, steam, sewer, and other utility controls before demolition, including owner coordination, records, verification, and stop-work triggers.
Scan to open or share
Point your phone at this code to open this talk, or screenshot it and text it to coworkers.
Use this talk in the field
Print this talk, create a sign-in sheet, or make a QR sticker crews can scan from equipment, work areas, safety boards, or job trailers.
Key Hazards
- Demolition contacting a live electric or gas service
- Assuming a disconnected utility from an outdated drawing or label
- Severing pressurized or contaminated piping
- Disconnecting a line still needed by adjacent occupied areas
- Unqualified workers testing or isolating hazardous services
- Beginning demolition before records and verification are complete
2–3 Minute Talk Script
Before demolition begins, workers must understand which utilities enter or pass through the structure. Cutting into an apparently empty building can expose people to electricity, gas, steam, water, and other dangerous services.
The demolition plan should identify all relevant service lines, their owners, connection points, and which adjacent occupants or systems could be affected. Old drawings and labels may be incomplete.
Applicable demolition requirements call for utilities to be shut off, capped, or otherwise controlled outside the building line before demolition starts, with advance notification to affected utility companies.
Qualified or authorized personnel should carry out the required isolation and verification. A worker should not assume a switch position, closed valve, disconnected meter, or inactive-looking line proves the hazard is gone.
Some services may need to remain in operation. Those lines require an approved plan for relocation or protection so demolition machinery, falling debris, and structural movement cannot damage them.
Identify pipes, tanks, or equipment that may have contained flammable, toxic, reactive, or other hazardous substances. Required evaluation, testing, purging, and hazard controls must be completed before disturbance.
Communicate verified utility status to everyone involved, including equipment operators and subcontractors. Clearly mark any remaining live systems and protect them from the demolition sequence.
If crews find an unidentified line, unexpected pressure, an unknown cable, or a conflict between drawings and conditions, stop the affected work. Obtain clarification and required controls before cutting, breaking, or pulling material.
Safety Reminders
- Identify all utilities and affected service owners
- Confirm required shutoff, capping, control, and notifications
- Use qualified or authorized personnel for isolation and verification
- Protect services that must remain operating
- Evaluate potentially hazardous substances in pipes and tanks
- Communicate the status and location of remaining live lines
- Stop on discovery of unidentified or unexpectedly active services
Ask the Crew
- Which utility lines pass through or into this structure?
- Who confirmed isolation and communicated that verification?
- Are any services intentionally staying active during demolition?
- What piping or equipment might contain hazardous residue?
- What is the stop-work process for an unknown line?